[1] B. Ashtiani, F. Haghighirad, A. Makui and A. Montazer, G, Extension of fuzzy TOPSIS
method based on interval-valued fuzzy sets, Applied Soft Computing, 9(2) (2009), 457-461.
[2] M. Better and F. Glover, Selecting project portfolios by optimizing simulations, The Engineering
Economist, 51(2) (2006), 81-97.
[3] Y. P. Cai, G. H. Huang, H. W. Lu, Z. F. Yang and Q. Tan, I-VFRP, An interval-valued fuzzy
robust programming approach for municipal waste-management planning under uncertainty,
Engineering Optimization, 44(5) (2009), 399-418.
[4] C. Carlsson, R. Fuller and J. Mezeiz, Project selection with interval-valued fuzzy numbers,
In 2011 IEEE 12th International Symposium on Computational Intelligence and Informatics
(CINTI) (2011)
[5] C. Carlsson, R. Fuller, M. Heikkila and P. Majlender, A fuzzy approach to R&D project
portfolio selection, International Journal of Approximate Reasoning, 44(2) (2007), 93-105.
[6] C. T. Chen and H. L. Cheng, A comprehensive model for selecting information system project
under fuzzy environment, International Journal of Project Management, 27(4) (2009), 389-
399.
[7] R. H. Chen, Y. Lin and M. L. Tseng, Multicriteria analysis of sustainable development
indicators in the construction minerals industry in China, Resources Policy, 46(1) (2015),
123-133.
[8] N. Chiadamrong, An integrated fuzzy multi-criteria decision making method for manufactur-
ing strategies selection, Computers & Industrial Engineering, 37(1) (1999), 433-436.
[9] C-Y. Chiu and C. S. Park, Capital budgeting decisions with fuzzy projects, The Engineering
Economist 43(2) (1998), 125-150.
[10] R. G. Cooper, S. J. Edgett and E. J. Kleinschmidt, New problems, new solutions: making
portfolio management more eective, Research-Technology Management, 43(2) (2000), 18-
33.
[11] C. Cornelis, G. Deschrijver and E. E. Kerre, Advances and challenges in interval-valued fuzzy
logic, Fuzzy sets and systems, 175(5) (2006), 622-627.
[12] T. Dyllick and K. Hockerts, Beyond the business case for corporate sustainability, Business
strategy and the environment, 11(2) (2002), 130-141.
[13] S. Ebrahimnejad, M. H. Hosseinpour and A. M. Nasrabadi, A fuzzy bi-objective mathemati-
cal model for optimum portfolio selection by considering in
ation rate eects, International
Journal of Advanced Manufacturing Technology, 69(1-4) (2013), 595-616.
[14] S. Ebrahimnejad, S. M. Mousavi, R. Tavakkoli-Moghaddam, H. Hashemi and B. Vahdani, A
novel two-phase group decision making approach for construction project selection in a fuzzy
environment, Applied Mathematical Modelling, 36(9) (2012), 4197-4217.
[15] J. Elkington, Cannibals with forks: the triple bottom line of 21st century business, Capstone
Publishing, Ltd, Oxford, 1997.
[16] R. Z. Farahani and N. Asgari, Combination of MCDM and covering techniques in a hierar-
chical model for facility location: A case study, European Journal of Operational Research,
176(3) (2007), 1839-1858.
[17] I. Grattan-Guinness, Fuzzy Membership Mapped onto Intervals and ManyValued Quantities,
Mathematical Logic Quarterly, 22(1) (1976), 149-160.
[18] L. S. Gaulke, X. Weiyang , A. Scanlon, A. Henck and T. Hinckley, Evaluation Criteria for
implementation of a sustainable sanitation and wastewater treatment system at Jiuzhaigou
National Park, Sichuan Province, China, Environmental management, 45(1) (2010), 93-104.
[19] D. H. Hong and S. Lee, Some algebraic properties and a distance measure for interval-valued
fuzzy numbers, Information Sciences, 148(1) (2002), 1-10.
[20] L. C. Hsu, A hybrid multiple criteria decision-making model for investment decision making,
Journal of Business Economics and Management, 15(3) (2014), 509-529.
[21] X. Huang, Mean-semivariance models for fuzzy portfolio selection, Journal of computational
and applied mathematics, 217(1) (2008), 1-8.
[22] M. J. Hutchins and J. W. Sutherland, An exploration of measures of social sustainability and
their application to supply chain decisions, Journal of Cleaner Production, 16(15) (2008),
1688-1698.
[23] C. L. Hwang and A. S. M. Masud, Multiple objective decision making, methods and applica-
tions: a state-of-the-art survey, Vol. 164. Berlin, Springer, 2012.
[24] S. Iamratanakul, P. Patanakul and D. Milosevic, Project portfolio selection: From past to
present, Proceedings of the 2008 IEEE ICMIT (2008), 287-292.
[25] M. G. Kaiser, F. El Arbi and F. Ahlemann, Successful project portfolio management beyond
project selection techniques: Understanding the role of structural alignment, International
Journal of Project Management, 33(1) (2015), 126-139.
[26] K. Khalili-Damghani and S. Sadi-Nezhad, A hybrid fuzzy multiple criteria group decision
making approach for sustainable project selection, Applied Soft Computing, 13(1) (2013),
339-352.
[27] K. Khalili-Damghani, S. Sadi-Nezhad, F. H. Lot and M. Tavana, A hybrid fuzzy rule-based
multi-criteria framework for sustainable project portfolio selection, Information Sciences, 220
(2013), 442-462.
[28] D. Kuchta, Fuzzy capital budgeting, Fuzzy Sets and Systems, 11(3) (2000), 367-385.
[29] S. H. Liao and S. H. Ho, Investment project valuation based on a fuzzy binomial approach,
Information Sciences, 180(11) (2010), 2124-2133.
[30] C. Lin and P. J. Hsieh, A fuzzy decision support system for strategic portfolio management,
Decision Support Systems, 38(3) (2004), 383-398.
[31] H. W. Lu, G. H. Huang and L. He, Development of an interval-valued fuzzy linear-
programming method based on innite -cuts for water resources management, Environmental
Modelling & Software, 25(3) (2010), 354-361.
[32] M. Maleti, D. Maleti, J. J. Dahlgaard, S. M. Dahlgaard-Park and B. Gomiek, Sustainability
exploration and sustainability exploitation: from a literature review towards a conceptual
framework, Journal of Cleaner Production, 79 (2014), 182-194.
[33] K. Manley, Against the odds: small rms in Australia successfully introducing new technology
on construction projects, Research Policy, 37(10) (2008), 1751-1764.
[34] G. Mavrotas and O. Pechak, Combining mathematical programming and monte carlo simula-
tion to deal with uncertainty in energy project portfolio selection, assessment and simulation
tools for sustainable energy systems, Springer London, (2013), 333-356.
[35] J. Mezei and R. Wikstrom, Aggregation operators and interval-valued fuzzy numbers in deci-
sion making, advances in information systems and technologies, Springer Berlin Heidelberg,
(2013), 535-544.
[36] V. Mohagheghi, S. M. Mousavi and B. Vahdani, A new optimization model for project port-
folio selection under interval-valued fuzzy environment, Arabian Journal for Science and
Engineering, 40(11) (2015), 3351-3361.
[37] S. M. Mousavi, F. Jolai and R. Tavakkoli-Moghaddam, A fuzzy stochastic multi-attribute
group decision-making approach for selection problems, Group Decision and Negotiation,
22(2) (2013), 207-233.
[38] S. M. Mousavi, S. A. Torabi and R. Tavakkoli-Moghaddam, A hierarchical group decision-
making approach for new product selection in a fuzzy environment, Arabian Journal for
Science and Engineering, 38(11) (2013), 3233-3248.
[39] S. M. Mousavi, B. Vahdani, R. Tavakkoli-Moghaddam, S. Ebrahimnejad and M. Amiri, A
multi-stage decision making process for multiple attributes analysis under an interval-valued
fuzzy environment, International Journal of Advanced Manufacturing Technology, 64 (2013),
1263-1273.
[40] T. Rashid, I. Beg and S. M. Husnine, Robot selection by using generalized interval-valued
fuzzy numbers with TOPSIS, Applied Soft Computing, 21 (2014), 462-468.
[41] B. Rebiasz, Fuzziness and randomness in investment project risk appraisal, Computers &
Operations Research, 34(1) (2007), 199-210.
[42] K. W. Robert, T. M. Parris and A. A. Leiserowitz, What is sustainable development? Goals,
indicators, values, and practice, Environment: Science and Policy for Sustainable Development,
47 (3) (2005), 8-21.
[43] United Nations, Report of the World Commission on Environment and Development: Our
Common Future, 1987.
[44] B. Vahdani, S. M. Mousavi, R. Tavakkoli-Moghaddam, A. Ghodratnama and M. Mohammadi,
Robot selection by a multiple criteria complex proportional assessment method un-
der an interval-valued fuzzy environment, International Journal of Advanced Manufacturing
Technology, 73(5-8) (2014), 687-697.
[45] B. Vahdani, R. Tavakkoli-Moghaddam, S. M. Mousavi and A. Ghodratnama, Soft computing
based on new interval-valued fuzzy modied multi-criteria decision-making method, Applied
Soft Computing, 13 (2013), 165-172.
[46] B. Vahdani, S. M. Mousavi and S. Ebrahimnejad, Soft computing-based preference selection
index method for human resource management, Journal of Intelligent and Fuzzy Systems,
26(1) (2014), 393-403.
[47] J. Wang and W. L. Hwang, A fuzzy set approach for R&D portfolio selection using a real
options valuation model, Omega, 35(3) (2007), 247-257.
[48] D. J. Watt, B. Kayis and K. Willey, Identifying key factors in the evaluation of tenders for
projects and services, International Journal of Project Management, 27(3) (2009), 250-260.
[49] J. S. Yao and F. T. Lin, Constructing a fuzzy
ow-shop sequencing model based on statistical
data, International journal of approximate reasoning, 29(3) (2002), 215-234.
[50] K. K. F. Yuen, A hybrid fuzzy quality function deployment framework using cognitive net-
work process and aggregative grading clustering: an application to cloud software product
development, Neurocomputing, 142 (2014), 95-106.
[51] K. K. F. Yuen, Fuzzy cognitive network process: comparisons with fuzzy analytic hierarchy
process in new product development strategy, IEEE Transactions on Fuzzy Systems, 22(3)
(2014), 597-610.
[52] K. K. Yuen and H. C. Lau, A Linguistic Possibility-Probability Aggregation Model for decision
analysis with imperfect knowledge, Applied Soft Computing, 9(2) (2009), 575-589.
[53] W. G. Zhang, Q. Mei, Q. Lu and W. L. Xiao, Evaluating methods of investment project
and optimizing models of portfolio selection in fuzzy uncertainty, Computers & Industrial
Engineering, 61(3) (2011), 721-728.